COMMERCIAL INTERIOR RENOVATION
From the existing shell to the systems behind the finished space.
Interior-shell demolition · Slab restoration for plumbing · New electrical, lighting, and controls
At Jungle Pilates, the work went beyond surface finishes. The owner-confirmed scope included demolition of the interior shell, concrete removal and replacement for plumbing, and new electrical panels, wiring, lights, and controls.
Explore the original project photographs →
The work behind the renovation
8 Pillars Concrete: full interior-shell demolition and concrete tear-out and repour for plumbing access.
Twins Engineering: new electrical panels, wiring, lighting, and controls.
Connecting the stages of a commercial build-out
Renovation work connects existing conditions, installation access, building systems, and the intended use of the finished space. The confirmed scopes at Jungle Pilates illustrate the coordination priorities below.
01 · Budget and scope
Separate demolition, concrete restoration, electrical installation, and finish interfaces. Identify exclusions and allowances for concealed conditions so discoveries can be reviewed against a defined scope before additional work is authorized.
02 · Design coordination
Bring plumbing routes, slab openings, electrical panels, lighting layouts, and control requirements into a coordinated review. Align the installation information with room use, equipment requirements, and the responsible design professionals' documents.
03 · Sequencing
Demolition creates access; the plumbing-related slab work connects installation below the floor with its reinstatement. Define applicable inspection and review requirements before closing access, then coordinate the protection of restored and finished areas.
04 · Subcontractor coordination
Concrete restoration depends on the work below it. Lighting and controls depend on the electrical installation and final space requirements. Clear release points identify who verifies each area and when the following trade can proceed.
05 · Schedule
Coordinate access windows, deliveries, and any required service interruptions with the property team. Track panel and lighting availability, design decisions, and review dates against the sequence of work.
06 · Field execution
The project record has a specific construction story: opening the existing interior shell, removing and replacing concrete for plumbing, and installing new panels, wiring, lighting, and controls. Explore the gallery alongside those defined scopes.
07 · Turnover and operation
Prepare for the owner's use of the space with applicable lighting-control demonstrations, operating information, inspection documentation, punch-list resolution, and warranty records. Plan that handoff before the final phase.
Project design and required professional services are assigned to the responsible architects, engineers, and licensed providers.
Planning a commercial renovation?
Send the property location, current layout, intended use, available plans, and target schedule. Identify any occupied areas or access restrictions so the discussion starts with the conditions that will shape the work.
Explore our general contracting services and commercial renovation capabilities for scope definition, trade interfaces and the path to turnover. For a trade-specific package, review Twins Engineering’s electrical bid requirements.